07\06\2010 - Public holiday replacement.
08\06\2010 - 09\06\2010 - Continue doing report
10\06\2010 - Visiting lecturer visit at 3.00pm. Go through the task that I have done before.
11\06\2010 - Learn about test program and start applying it..
Wednesday, June 23, 2010
Tuesday, June 8, 2010
9TH WEEK REPORT
31/05/2010 - 04/06/2010 - Complete with the powerpoint slide for presentation and still doing
the report.
- Follow Norshuhadah to the warehouse and took few lots.
- Help Jason Leong(technician) to arrange few stuff accordingly.
the report.
- Follow Norshuhadah to the warehouse and took few lots.
- Help Jason Leong(technician) to arrange few stuff accordingly.
8TH WEEK REPORT
24/05/2010 - 28/05/2010 - Help kakak Ai Zhen to seal her wafers where I need to go to probe.
- Continue doing powerpoint slide and start doing report for
industrial training.
- Folow Norshuhadah Nasirudin(technician) to the warehouse to
take few lots and get to know many useful info there
- Help Norshuhadah to compare flow between ZR and our's where
we need to do two different columns which is REF and NEW.
- Continue doing powerpoint slide and start doing report for
industrial training.
- Folow Norshuhadah Nasirudin(technician) to the warehouse to
take few lots and get to know many useful info there
- Help Norshuhadah to compare flow between ZR and our's where
we need to do two different columns which is REF and NEW.
7TH WEEK REPORT
17/05/2010 - - Supervisor taught to pull historical electrical data for the device which is given.
21/05/2010 - - I need to pull five lots for each device and save it in excel for reference.
- Continue doing powerpoint slides for presentation.
- Help kakak Ai Zhen which is a device engineer to seal wafers where I need to go
to probe.
21/05/2010 - - I need to pull five lots for each device and save it in excel for reference.
- Continue doing powerpoint slides for presentation.
- Help kakak Ai Zhen which is a device engineer to seal wafers where I need to go
to probe.
Monday, May 31, 2010
6TH WEEK REPORT
10/05/2010 - Holiday replacement for 1st Mei
11\05\2010 14/05/2010 - Continue with last week work which is to snap picture and upload
maskset for Bipolar device.
11\05\2010 14/05/2010 - Continue with last week work which is to snap picture and upload
maskset for Bipolar device.
Friday, May 14, 2010
5TH WEEK REPORT
03/05/2010 - Complete creating electrical test spec for the Ultrafast device.
04/05/2010 - Download test program from Newton for Filter and B2B Zener and then
continue creating electrical test spec for the both device.
05/05/2010 - Mr Prakash Rajah(supervisor) taught how to upload maskset to the website
for the Ultrafast device.
- I just need to upload the maskset because he has already snap the picture.
06/05/2010 - Miss Ai Zhen Lai taught how to upload maskset for Bipolar device where I need
to snap the pictures by myself and it is interesting.
07/05/2010 - Continue uploading maskset for the Bipolar device.
04/05/2010 - Download test program from Newton for Filter and B2B Zener and then
continue creating electrical test spec for the both device.
05/05/2010 - Mr Prakash Rajah(supervisor) taught how to upload maskset to the website
for the Ultrafast device.
- I just need to upload the maskset because he has already snap the picture.
06/05/2010 - Miss Ai Zhen Lai taught how to upload maskset for Bipolar device where I need
to snap the pictures by myself and it is interesting.
07/05/2010 - Continue uploading maskset for the Bipolar device.
4RD WEEK REPORT
26\04\2010-27/04/2010 - Attend On Semiconductor (ISMF) Orientation Program which is for
2 days.
28/04/2010 - Download test program from Newton for the Ultrafast device
29/04/2010-30/04/2010 - Create electrical test spec for the ultrafast device.
2 days.
28/04/2010 - Download test program from Newton for the Ultrafast device
29/04/2010-30/04/2010 - Create electrical test spec for the ultrafast device.
3RD WEEK REPORT
19/04/2010-23/04/2010 - Trying to complete spec for the Bipolar device because there is
about 140 spec.
about 140 spec.
Thursday, May 13, 2010
2ND WEEK REPORT
12/04/2010 - Download test program for SS Schottky and Bipolar.
13/04/2010 - Miss Iryani taught how to create electrical test spec for the test program. For
doing this I need to use Promis software and she also taught how to use it.
14/04/2010 - 15/04/2010 - Start doing spec for the SS Schottky device which refering to the
test program that I download.
16\04\2010 - Do spec for the Bipolar device.
13/04/2010 - Miss Iryani taught how to create electrical test spec for the test program. For
doing this I need to use Promis software and she also taught how to use it.
14/04/2010 - 15/04/2010 - Start doing spec for the SS Schottky device which refering to the
test program that I download.
16\04\2010 - Do spec for the Bipolar device.
Wednesday, May 12, 2010
1ST WEEK REPORT
05/04/2010 - Report for duty at On Semiconductor (Site 2)
- Do some readings about OnSemi and answer test paper
06/04/2010 - Visit the fab where the wafer is processed in the production site.
- Supervisor explain my main responsibilities which are :
- Help to validate new Promis PRODS/ process flow
- Download and test program from newton.
- Create electrical test spec for test program
07/04/2010 - Mr Prakash Rajah (supervisor) gave me some reading material to go through.
08/04/2010 - Get to know many information about Promis in the reading material.
09/04/2010 - Miss Iryani which is under Mr Prakash Rajah(supervisor) taught me to
download test program from newton
- Do some readings about OnSemi and answer test paper
06/04/2010 - Visit the fab where the wafer is processed in the production site.
- Supervisor explain my main responsibilities which are :
- Help to validate new Promis PRODS/ process flow
- Download and test program from newton.
- Create electrical test spec for test program
07/04/2010 - Mr Prakash Rajah (supervisor) gave me some reading material to go through.
08/04/2010 - Get to know many information about Promis in the reading material.
09/04/2010 - Miss Iryani which is under Mr Prakash Rajah(supervisor) taught me to
download test program from newton
ABOUT ME
Hi im Gurpreet Kaur A\P Param Singh from Universiti Tenaga Nasional 2nd year student and doing Bachelor Of Computer Science(Software Engineering)
Industrial Training Details :
Company : ON SEMICONDUCTORS-SCG INDUSTRIAL MALAYSIA SDN BHD,
LOT 122. SENAWANG INDUSTRIAL ESTATE,
70450 SEREMBAN,
NEGERI SEMBILAN
Department : Device Department
Supervisor : Mr. Prakash Rajah
Industrial Training Details :
Company : ON SEMICONDUCTORS-SCG INDUSTRIAL MALAYSIA SDN BHD,
LOT 122. SENAWANG INDUSTRIAL ESTATE,
70450 SEREMBAN,
NEGERI SEMBILAN
Department : Device Department
Supervisor : Mr. Prakash Rajah
INTRODUCTION TO COMPANY
- ON SEMICONDUCTORS-SCG INDUSTRIES SDN BHD.
- GLOBAL CORPORATE HEADQUATERS ARE IN PHOENIX, ARIZONA.
- OPERATES A NETWORK OF MANUFACTURING FACILITIES, SALES OFFICES AND DESIGN CENTERS IN KEY MARKETS THROUGHOUT NORTH AMERICA, EUROPE AND ASIA PACIFIC REGIONS.
- FIRST FACILITY ALLIGNS WAFER FABRICATIONS, ASSEMBLY AND TESTING UNDER ONE ROOF, PRODUCING DISCRETE TRANSISTORS, BIASEDRESISTOR TRANSISTORS, AND SWITCHING DIODES FROM MANUFACTURING FACILITIES IN SENAWANG INDUSTRIAL ESTATE, SEREMBAN MALAYSIA.
- SITE 1-BACK END-ASSEMBLY PROCESS
- SITE 2 -FRONT END(ISMF)-WHERE THE WAFERS BEING PROCESSED